Lifting Equipment

Manual Geared Trolley Hand -Pulled Beam Trolley 20ton

WUXI TONGYANG MACHINERY TECHNOLOGY CO., LTD.
  • After-sales Service:12 Months
  • Warranty:One Year After Sale
  • Application:Double Beam Crane, Gantry Crane, Bridge Crane, Tower Crane, Single Grinder Crane, Lifting Platform, Small Crane
  • Type:Chain Hoist
  • Sling Type:Chain
  • Certification:CE

Base Info

  • Model NO.:HGT200
  • Condition:New
  • Color:Orange
  • Load Capacity:20000kg
  • Beam Flange Width:144-203mm
  • Transport Package:Carton +Pallet
  • Trademark:Yinglift
  • Origin:China
  • HS Code:8425110000
  • Production Capacity:10000 Pieces,Year

Description

Net Weight                      kg1419284065103245Manual Geared Trolley Hand -Pulled Beam Trolley 20ton
Manual Geared Trolley Hand -Pulled Beam Trolley 20ton

Manual Geared Trolley Hand -Pulled Beam Trolley 20tonManual Geared Trolley Hand -Pulled Beam Trolley 20ton
Manual Geared Trolley Hand -Pulled Beam Trolley 20tonManual Geared Trolley Hand -Pulled Beam Trolley 20tonManual Geared Trolley Hand -Pulled Beam Trolley 20tonManual Geared Trolley Hand -Pulled Beam Trolley 20tonManual Geared Trolley Hand -Pulled Beam Trolley 20ton
FAQ:
1.Q.Are you factory?
   A.Yes.Our factory mainly produce drum handling equipment,drum stacker,drum truck,aluminum hand trolley ,kinds lift table ,forklift attachment and shop crane with CE approved, pasted Third-party certification(SGS/ISO9001).
2.Q.Can I place mix order?
   A.Yes.You can mix different models as your request.
3.Q.Can we order products?
   A.Yes. Customers can option size,color,weighing,panel etc.Welcome ODM/OEM orders.
4.Q.Can we visit your factory?
   A.Welcome anytime .Our factory address:No. 38, Yansheng Road, Yanqiao Industrial Park,Huishan District,Wuxi,Jiangsu,China (Mainland) .You can take the plane, high-speed rail, motor car, train, car.
5.Q.Are the products covered by a warranty?
   A.Yes.All our machines carry a full 1 year major parts warranty.

Quality Control in our Wuxi Tongyang:
The quality control is strictly in accordance with ISO9001 quality management system. When the products are finished, the inspection is 100% executed strictly
1) Strict quality control system on the whole process of production
2) Imported key arts to ensure the high quality of our products
3) Advanced equipment and tools for examination and quality control
4) 100% strict examining products before shipment
5) All the quality complaints and improvement requirements are always studied seriously, if reasonable, put into practice immediately.